HuBei Longganhu Agriculture waste treatment project
Introduction for the environmental park:
Solid pig manure:156,950 t/a
Industrial organic waste:21,900 t/a
Project owner: CHD
Start-up time: 2011
GBE Service scope:
Business model: EPC
Equipment supply: 3 sets of CSTR digistor, 2 sets of CHP
Obtainment of Technical :MT-Energie from Germany
Biogas production:3,577,000 Nm³/a
Generating capacity: 7928 MW/a
CO2 saving: 6500 t/a
Project introduction:
The project focuses on the anaerobic fermentation of solids from pig manure produced by the nearby pig farm. Even if there is not enough pig manure, our system can continue to operate stably by adding other organic wastes that can be mixed with fermentation.
Adopt unique membrame covering fixing system, can fix double membrame well, save space, ensure the safe operation of the system.
The patented bio-desulfurization technology in tank can quickly remove H2S in biogas and reduce the cost of external desulfurization system.
The submersible agitator which can move vertically and horizontally can be maintained during operation. It is suitable for materials with solid content of 6%-30% and effectively solves the problems of air-resistance floating layer and material compaction.
More than 12 years of system optimization experience, to ensure the stable operation of the project.
This project applied for CDM project in 2012.