Current location: Home > Reference > Zibo MSW treatment Project


Zibo MSW Treatment Project


Introduction for project:

  MSW:1800t/d

     Project owner: Jinjiang environment group

   Start-up time: 2018

GBE service scope:

        waste screen: 2 sets,35t/h

        flip-flop screen:2 sets of 25t/h

      Eddy current separator: 2 sets of 35t/h

    metal separator: 2 sets

Project introduction:

This project is Jinjiang environmental MSW incineration project.  After biological drying, the MSW enters the waste sorting process, selects inert sundries, recycles useful metals, and sorts out high calorific value sundries, after crushing the material were sent to the fluidized bed incinerator.  

GBE is the agent of IFE Austria in China, IFE has provided the screening equipment for the sorting line of this project, such as waste screen,flip-flop screen,eddy current separator, metal separator and so on.  GBE is responsible for the after-sale service and spare parts. IFE equipment has been running stably since the project was put into operation. 



锦江项目 Linzi MBT 车间 (2).jpg


锦江项目 Linzi MBT 车间 (1).jpg